6d1f470ba5
Mark all resource system phases (A, B, C, D.1-D.3) as complete in the LLM integration roadmap and design docs. D.4 (structure inspection) remains as future work. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>